Skip to main content
County of San Mateo

County of San Mateo

Public Works

Top Menu

  • Contact Us
  • Career
  • Departments
  • Translate
  • Services
    • Roads
    • Utilities
    • Airports
    • Surveying & Map Checking
    • Flood and Sea Level Rise Resiliency District
    • County Buildings
    • Graffiti Abatement
  • Projects
    • Our Projects
    • Your Construction Project
    • Projects Out to Bid
  • Permits
  • Info for Residents
    • Your Construction Project
    • Storm Preparedness
    • Flood Control Districts
  • About Us
    • Our Organization
    • Org Chart
    • Contact Info

You are here

Home

Public Works Project Archive

Reconstruction of A Street and 2nd Ave in Unincorporated Colma

Roadway reconstruction of A Street from El Camino Real to Third (3rd) Avenue and Second (2nd) Avenue from A Street to County/Daly City limit in the Unincorporated Colma Area.... View moreView Reconstruction of A Street and 2nd Ave in Unincorporated Colma

Reconstruction of Croner Avenue in the West Menlo Park Area

... View moreView Reconstruction of Croner Avenue in the West Menlo Park Area

2017 Coastside Cape and Slurry Seal Project

Pavement repairs, crack sealing, and applying a cape or slurry seal over existing roadway... View moreView 2017 Coastside Cape and Slurry Seal Project

Alpine Road Trail Improvements Project

Rehabilitation of approximately 1.84 miles of Alpine Road Trail... View moreView Alpine Road Trail Improvements Project

Madera Lane Bridge Preventive Maintenance Project

Repair of Madera Lane Bridge over El Corte De Madera Creek.... View moreView Madera Lane Bridge Preventive Maintenance Project

Alpine Road Bridge Preventive Maintenance Project

Repair of Alpine Road bridge over San Francisquito Creek... View moreView Alpine Road Bridge Preventive Maintenance Project

Stage Road Bridge Preventive Maintenance Project

Repair of Stage Road bridge over Pescadero Creek... View moreView Stage Road Bridge Preventive Maintenance Project

2017 Bayside Cape and Slurry Seal Project

The construction work will involve pavement repairs, crack sealing, and applying a cape or slurry seal over the existing roadway... View moreView 2017 Bayside Cape and Slurry Seal Project

2017 Resurfacing of Various Streets

Resurfacing of various streets in the Harbor Industrial, North Fair Oaks, West Menlo Park, Moss Beach and Montara Areas... View moreView 2017 Resurfacing of Various Streets

Reconstruction of Seventh Avenue in the North Fair Oaks Area

... View moreView Reconstruction of Seventh Avenue in the North Fair Oaks Area

Half Moon Bay Airport South Perimeter Installation Project

The existing 2,300 feet of perimeter fencing on the south-end of the Half Moon Bay Airport is in poor condition. Airports must be fenced in order to meet Federal Aviation Administration requirements. The perimeter fence will be replaced using material that is resistant to corrosion.... View moreView Half Moon Bay Airport South Perimeter Installation Project

Half Moon Bay Airport Windsock Replacement Project

Airport windsock will be replaced in order to meet Federal Aviation Administration requirements.... View moreView Half Moon Bay Airport Windsock Replacement Project

Half Moon Bay Airport Culvert Repair Project

Replacement of two culverts below Taxiway Bravo... View moreView Half Moon Bay Airport Culvert Repair Project

Crystal Springs Dam Bridge Replacement Project

... View moreView Crystal Springs Dam Bridge Replacement Project

Reconstruction of Lucky Ave & Liberty Park Ave, Menlo Park

Improving the intersecting streets, Lucky Ave & Liberty Park Ave, to meet road standards adopted by the Board of Supervisors for West Menlo Park.... View moreView Reconstruction of Lucky Ave & Liberty Park Ave, Menlo Park

Alpine Road Traffic Corridor Study

A comprehensive corridor study on Alpine Road that will to improve access and connectivity and reduce mobility barriers for all types of travel, and more.... View moreView Alpine Road Traffic Corridor Study

Reconstruction of Palo Alto Way, Leland Ave & Stanford Ave

The broadening and refinement of three roads in West Menlo Park, as desired by surveyed property owners, to comply with minimum road standards, including road width and gutters.... View moreView Reconstruction of Palo Alto Way, Leland Ave & Stanford Ave

Seal Cove/Moss Beach Area Roads Improvement

... View moreView Seal Cove/Moss Beach Area Roads Improvement
View More
COVID-19 Info
County of San Mateo
  • County Home
  • Board of Supervisors
  • A-Z Services
  • Departments
  • Open Data
  • Careers
  • Visiting County Center
  • Email Updates
  • Media Contacts
  • SMC Alert
  • Feedback
  • Browser Compatibility
  • Accessibility Policy
  • Privacy Policy
  • Endorsement Disclaimers
Connect with the County!
  • Facebook
  • Instagram
  • Linkedin
  • Twitter
  • Nextdoor
  • YouTube
Main: (650) 363-4000
Back to Top